Abouzar Oil Field Project

Designing, Purchasing, Manufacturing, Transportation & Installation of Platforms (A20-21) in Abouzar Field

• Start: 3 April, 2012
• Duration: 18 months
• Scope of work: Fabrication of two Jacket 600 ton, Two Top Deck 1100 ton & Installation of equipment on it Platform A20: Subsea pipeline about 2 X 6200, 10”, 6” Subsea Cabling about 13400 m Platform A21: Subsea pipeline about 2 X 2600, 10”, 8”